§ 28-344. Builder reimbursed.  


Latest version.
  • Upon receipt by the city of a connection charge in an amount equal to one-half of the actual per foot construction cost of the sewer for the full frontage of each lot to be connected, the city shall deduct and retain the sum of $300.00 and shall remit to the builder the balance of the connection charge. As successive sewage generating facilities are connected to the sanitary sewer installation, similar sums from each connection charge shall be remitted by the city to the builder, until the builder has been reimbursed for the expense of such installation of the sewer, less the non-refundable connection charge provided herein.

(Prior Code, § 100.06)