§ 10-25. Permit application and issuance.  


Latest version.
  • (a)

    Applications. An application for an outdoor furnace permit shall be made to the city clerk on a form provided by the city and shall contain and have attached thereto the following information:

    (1)

    Name, address and telephone number of the applicant.

    (2)

    Address of the lot upon which the outdoor furnace is to be installed or constructed.

    (3)

    A site plan indicating the proposed location of the outdoor furnace in relation to all plot lines and structures located within 250 feet.

    (4)

    The name of the manufacturer and model number for the outdoor furnace, together with a copy of the manufacturer's installation, operation and maintenance instructions.

    (5)

    A description of the stack or chimney proposed to be used in connection with the outdoor furnace, including its height and a description of any guy wires or other devices to be used to support or stabilize the stack.

    (6)

    Such other information as the city clerk shall require to show full compliance with this article and all other ordinances of the city.

    (7)

    Proof of insurance liability coverage on a building, premises or homeowner's policy covering the use of the outdoor furnace.

    (b)

    Permit fee. The applicant shall file with the outdoor furnace permit application an administration and inspection fee in the amount of $25.00 which shall be deposited in the city 's general fund.

    (c)

    Applicant. The applicant for an outdoor furnace permit shall, in all cases, be the owner of the lot on which the outdoor furnace is to be located.

    (d)

    Time; rejections. The zoning administrator shall issue an outdoor furnace permit or deny an outdoor furnace application within ten days after receipt of an application, provided that the required information is contained in the application and the other conditions set forth in this section have been satisfied by the applicant. The zoning administrator shall deny any application which is not filed in conformity with this section or which proposes an outdoor furnace which would be contrary to the provisions of this article. Any denial of an application shall be given in writing with the reasons for such denial stated thereon. If an application is denied, the permit fee shall be refunded to the applicant.

    (e)

    Issuance. An outdoor furnace permit shall be issued by the zoning administrator when the application and the investigation thereof indicate compliance by the applicant with all of the provisions of this article and all other applicable laws. The permit shall specify the minimum stack or chimney height that must be used in connection with the outdoor furnace.

    (f)

    Records. A careful record of all permit applications and permits shall be maintained by the city clerk

(Prior Code, § 126.07)